Fohren-Linden
The wind park with a total installed capacity of 12.8 MW was built as a turnkey project in southwest Germany (in the territory of the Province of Rhineland-Palatinate).
CEZ acquired the project, including a 20-year feed-in tariff subsidization contract, from AREAM, a German Investment and Asset Manager.
Fact sheet
- Number of turbines: 4
- Turbine type: Senvion
- Rated power: 12,8 MW
- Commissioning: 2016