Fohren-Linden

The wind park with a total installed capacity of 12.8 MW was built as a turnkey project in southwest Germany (in the territory of the Province of Rhineland-Palatinate).

CEZ acquired the project, including a 20-year feed-in tariff subsidization contract, from AREAM, a German Investment and Asset Manager.

Fact sheet
  • Number of turbines: 4
  • Turbine type: Senvion
  • Rated power: 12,8 MW
  • Commissioning: 2016