10/12/2021
INFORMATION ON NPP DUKOVANY 12/10/2021
Units 1, 2, 3, 4 are operated on power operation. Electricity production since the beginning of the operation: 473 686 608 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 493 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 499 MWe
Electricity production since the beginning of the year: 11 505 114 MWh.