9/25/2023
Information on NPP DUKOVANY 26/9/2023
Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 502 510 441 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 491 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 481 MWe
Unit 4 is in Mode 1 - stable operation on thermal and power effect, Reactor power is 90,7 %, Turbine generator output - 440 MWe
Electricity production since the beginning of the year: 10 733 611 MWh.
News on the topic
Czech Nuclear Power Plants Comply with International Environmental Protection Standards