Skip to Content
Publication date

Information on NPP DUKOVANY 30/09/2026

Units 1, 2, 3, 4 are in the operation. Electricity production since the beginning of the operation: 546 095 711 MWh.

Information on parameters of Unit 1-4, today at 7:00 hrs:

Unit 1 - power operation, Reactor power is 100 %, Turbine generator output - 504 MWe
Unit 2 - power operation, Reactor power is 100 %, Turbine generator output - 500 MWe
Unit 3 - power operation, Reactor power is 99,5 %, Turbine generator output - 501 MWe
Unit 4 - power operation, Reactor power is 100 %, Turbine generator output - 508 MWe

Electricity production since the beginning of the year: 10 619 124 MWh.