9/11/2020
Information on NPP Dukovany 11/09/2020
Units 1, 2, 3 and 4 are operated on power operation. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 458 184 234 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 490 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 486 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 487 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
Electricity production since the beginning of the year: 10 299 358 MWh.