11/24/2020
Information on NPP Dukovany 24/11/2020
Units 3 and 4 are operated on power operation. Unit 1 is in planned outage. Unit 2 is in a startup mode after refuelling. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 460 854 806 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 6 - outage
Unit 2 is in Mode 1 - startup after refuelling, Reactor power is 35 %, Turbine generator output - 129 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 489 MWe
Unit 4 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
Electricity production since the beginning of the year: 12 969 930 MWh.