3/5/2021
Information on NPP Dukovany 5/3/2021
Units 1, 2, 3 are operated on power operation. Unit 4 is in outage. All systems are working in accordance with operational needs of the units. Electricity production since the beginning of the operation: 464 430 402 MWh.
Information on parameters of Unit 1-4, today at 7:00 hrs:
Unit 1 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 498 MWe
Unit 2 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 495 MWe
Unit 3 is in Mode 1 - power operation, Reactor power is 100 %, Turbine generator output - 494 MWe
Unit 4 is in Mode 7 - outage
Electricity production since the beginning of the year: 2 248 909 MWh.