Skip to Content

INFORMATION ON NPP TEMELÍN 1 / 2026

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 26 389 MWh

Information on parameters at Unit 2:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 26 397 MWh

Marek Sviták, mluvčí ČEZ, Jaderná elektrárna Temelín