INFORMATION ON NPP TEMELÍN 10 / 2021

Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1087 MWe
  • Electricity production since the beginning of the year: 365 430 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1104 MWe
  • Electricity production since the beginning of the year: 370 620 MWh