Skip to Content
Publication date

INFORMATION ON NPP TEMELÍN 109 / 2026

Both Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1
  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 4 156 032 MWh
Information on parameters at Unit 2
  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 2 612 104 MWh