20/07/2020
INFORMATION ON NPP TEMELÍN 139 / 2020
Unit 1 is in operation at full rated power. Unit 2 is in the planned outage for refuelling. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in operation
- Turbine generator output – 1066 MWe
- Electricity production since the beginning of the year: 3 458 823 MWh
Information on parameters at Unit 2:
- Unit is in the planned outage
- Turbine generator output - 0 MWe
- Electricity production since the beginning of the year: 4 272 380 MWh
News on the topic