INFORMATION ON NPP TEMELÍN 159 / 2021
The Unit 1 is in the operation. The Unit 2 is in the outage for refueling. The Unit The auxiliary systems are working in accordance with the operation needs of individual units.
Tomorrow, August 19, 2021 will be held an emergency training the area Dukovany NPP at place SURAO (Radioactive Waste Repository Authority). The training is in gestion of SURAO with cooperation Emergency Response Organization Dukovany NPP. Within the training will be used simulation device (smoke generator) which could be visible out of NPP area. NPP personnel and Mayors of municipalities are informed in advance. Moreover, the public was informed through the media and other information systems.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1086 MWe
- Electricity production since the beginning of the year: 4 441 279 MWh
Information on parameters at Unit 2:
- Unit is in the outage
- Turbine generator output – 0 MWe
- Electricity production since the beginning of the year: 4 559 790 MWh
News on the topic
The country’s largest parking complex with a photovoltaic power plant built at the Dukovany Nuclear Power Plant
ČEZ Started Security Screening of Potential Bidders for a New Nuclear Unit in Dukovany
Elektrárna Dukovany II applied for a zoning permit for a new nuclear source at the Dukovany site today
Temelín's Unit 1 restored the production of electricity. The outage has taken place in the mode of full testing of both plant and suppliers’ staff