Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.

Information on parameters at Unit 1:

  • Unit is in the operation
  • Turbine generator output – 1071 MWe
  • Electricity production since the beginning of the year: 5 195 794 MWh

Information on parameters at Unit 2:

  • Unit is in the operation
  • Turbine generator output – 1082 MWe
  • Electricity production since the beginning of the year: 5 043 126 MWh