11/9/2020
INFORMATION ON NPP TEMELÍN 217 / 2020
The Unit 1 a 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1085 MWe
- Electricity production since the beginning of the year: 6 309 213 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output - 1103 MWe
- Electricity production since the beginning of the year: 6 651 055 MWh