11/11/2022
Information on NPP Temelín 219 / 2022
Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1098 MWe
- Electricity production since the beginning of the year: 6 788 214 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1097 MWe
- Electricity production since the beginning of the year: 6 807 610 MWh
News on the topic
The outage of Temelín's Unit 2 completed
On Friday, ČEZ will start the regular replacement of fuel assemblies at Temelín Unit 2. They will connect the outage with a range of investments.
We are strengthening the energy security of the Czech Republic: we have signed contracts for the supply of fuel assemblies with Westinghouse and Framatome
CEZ will acquire Škoda JS, a major Czech company dedicated mainly to nuclear servicing and engineering