08/12/2022
Information on NPP Temelín 237 / 2022
Unit 1 and 2 are in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1102 MWe
- Electricity production since the beginning of the year: 7 503 464 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1101 MWe
- Electricity production since the beginning of the year: 7 521 268 MWh
News on the topic