Skip to Content
Publication date

INFORMATION ON NPP TEMELÍN 28 / 2026

Both Unit 1 and 2 are in operation. The auxiliary systems are working in accordance with the operational needs of the individual units.

Information on parameters at Unit 1:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 1 078 863 MWh

Information on parameters at Unit 2:

  • The power of the reactor – 100 %
  • Electricity production since the beginning of the year: 1 038 201 MWh