08/02/2021
INFORMATION ON NPP TEMELÍN 26 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
 - Turbine generator output – 1088 MWe
 - Electricity production since the beginning of the year: 991 948 MWh
 
Information on parameters at Unit 2:
- Unit is in the operation
 - Turbine generator output – 1104 MWe
 - Electricity production since the beginning of the year: 1 005 704 MWh
 
News on the topic