03/03/2021
INFORMATION ON NPP TEMELÍN 43 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1088 MWe
- Electricity production since the beginning of the year: 1 592 054 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1104 MWe
- Electricity production since the beginning of the year: 1 614 230 MWh
News on the topic