12/03/2021
INFORMATION ON NPP TEMELÍN 50 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1087 MWe
- Electricity production since the beginning of the year: 1 827 135 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1100 MWe
- Electricity production since the beginning of the year: 1 852 296 MWh
News on the topic