23/03/2021
INFORMATION ON NPP TEMELÍN 57 / 2021
Both Unit 1 and 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1082 MWe
- Electricity production since the beginning of the year: 2 114 331 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1096 MWe
- Electricity production since the beginning of the year: 2 143 372 MWh
News on the topic