03/05/2021
INFORMATION ON NPP TEMELÍN 84 / 2021
Unit 1 is in the planned outage for refuelling. Unit 2 is in the operation. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the outage
- Turbine generator output – 0 MWe
- Electricity production since the beginning of the year: 2 213 479 MWh
Information on parameters at Unit 2:
- Unit is in the operation
- Turbine generator output – 1101 MWe
- Electricity production since the beginning of the year: 3 220 322 MWh
News on the topic