11/11/2024
INFORMATION ON NPP TEMELÍN 217 / 2024
Unit 1 is in the operation. Unit 2 is in the planned outage for refuelling. The auxiliary systems are working in accordance with the operation needs of individual units.
Information on parameters at Unit 1:
- Unit is in the operation
- Turbine generator output – 1090 MWe
- Electricity production since the beginning of the year: 6 136 412 MWh
Information on parameters at Unit 2:
- Unit is in the outage
- Turbine generator output - 0 MWe
- Electricity production since the beginning of the year: 6 882 762 MWh
News on the topic
- ČEZ will shut down Unit 2 this evening for inspections and replacement of fuel assemblies
- ČEZ evaluated bids for the construction of a new nuclear unit and named its preferred bidder, with results submitted to Ministry of Industry and Trade
- The first Temelín Unit produces electricity again. It has been shut down for two months to inspect and replace fuel assemblies
- Elektrárna Dukovany II of the CEZ Group received supplemented bids from bidders for the construction of a new nuclear source in Dukovany and binding options for three additional nuclear units